Menu
EN
Sustainability and ESG

A considered choice matters throughout its use

Environmental and practical considerations can be brought together when an entrance is designed. Planned material quantities, targeted module replacement and documented care support its use over time.

Request project information
Sustainability and ESG
Site photograph
01

Planned material use

Aluminium is a recyclable material. Planning the module layout and cutting positions in advance can align production with the material quantities required. Assessing the complete installation also means considering the walking surface, backing materials and fixings.

02

Replacement where it is needed

The manufacturer’s brochure states that a damaged module can be replaced separately. Targeted repairs can keep serviceable modules in place, potentially reducing the material demand and waste associated with a full replacement. Access is agreed for the specific installation.

03

Care suited to use

An appropriately sized entrance matting system can retain some of the dust, mud and moisture brought in on footwear. This may reduce cleaning demand on interior floors and the associated use of water or cleaning products. Surface selection and regular maintenance work together.

04

Documented material selection

Surface codes, the module layout and current technical documents support later identification and refurbishment. Supplier environmental declarations assigned to the exact component, together with planned cleaning data, can inform the project’s life-cycle assessment.

Modulier / Sustainability and ESG

The design lives on

Keep a reliable reference after installation.

  1. Design

    Record the layout, cutting positions and surface codes. Base material quantities on the actual entrance.

  2. Use

    Match cleaning to footfall and the instructions for the installed system. The entrance also helps protect interior floors.

  3. Renewal

    Surface codes and the module layout support discussions about targeted replacement. Plan the treatment of removed materials for the specific installation.

ESG / Sustainability and ESG

ESG: information for the whole project

ESG brings together environmental, social and governance considerations. An entrance can contribute meaningfully to project objectives when material selection, use and later interventions are assessed together.

Environmental considerations

A planned layout and targeted replacement of a damaged module focus attention on the materials actually needed. Aluminium’s recyclability is assessed alongside the materials in the complete installation and their treatment after removal.

People and interior spaces

Dust and moisture retained at the entrance can help maintain a cleaner indoor environment. Appropriate sizing, walking surfaces, transitions and maintenance all matter in reducing slip risk.

Documented life-cycle decisions

Traceable design and material records support decisions about purchasing, cleaning and later local replacement costs. In LEED, BREEAM or WELL projects, compliance is assessed with the project assessor against the whole building and the applicable rating system.

Request documents for my project

Supplier environmental information

The Forbo Coral Classic product page and Environmental Product Declaration (EPD) cover the textile product specified in those documents. A project assessment of the Modulier system must also consider the complete construction, aluminium, backing materials, fixing and use.

Forbo Coral Classic product information Forbo Coral Classic supplier EPD (EN)
Modulier / Cleartex

Let’s discuss your own project

You can review the selections shown here before sending. Contacting us does not require optional analytics consent.

cleartex@cleartex.hu
+36 23 887 400
Contact the Modulier team
The starting point for your enquiry
Page
Photo or drawing · optional

JPG, PNG, WebP or PDF. Up to 3 files, 5 MB per file and 10 MB in total.

A photo or floor plan is a good starting point.

    Cleartex processes the details and attachments you provide to answer your enquiry. Privacy notice ↗

    We will be in touch within a few days.

    Cookies and local storage